{"id":2892,"date":"2016-03-31T22:16:00","date_gmt":"2016-03-31T22:16:00","guid":{"rendered":"https:\/\/www.arianne-inc.com\/?post_type=news&#038;p=2298"},"modified":"2022-04-01T22:23:04","modified_gmt":"2022-04-01T22:23:04","slug":"arianne-phosphate-reports-financial-results-for-q4-and-ye-2015","status":"publish","type":"post","link":"https:\/\/itremma.com\/arianne\/fr\/arianne-phosphate-reports-financial-results-for-q4-and-ye-2015\/","title":{"rendered":"ARIANNE PHOSPHATE PUBLIE SES R\u00c9SULTATS OP\u00c9RATIONNELS ET FINANCIERS \nDU QUATRIEME TRIMESTRE ET DE L\u2019EXERCICE DE 2015"},"content":{"rendered":"<p class=\"wp-block-paragraph translation-block\"><strong>SAGUENAY, QU\u00c9BEC - (31 mars 2016) \u2013 Arianne Phosphate (la \u00ab Soci\u00e9t\u00e9 \u00bb ou \u00ab Arianne \u00bb) (Bourse de croissance TSX : DAN) (FRANCFORT : JE9N) (OTCBB : DRRSF)<\/strong>, une soci\u00e9t\u00e9 en stade de d\u00e9veloppement du projet de mine de phosphate du Lac \u00e0 Paul, dans la r\u00e9gion du Saguenay\u2014Lac-Saint-Jean, au Qu\u00e9bec, publie ses r\u00e9sultats op\u00e9rationnels et financiers pour les p\u00e9riodes de trois mois et douze mois termin\u00e9es le 31 d\u00e9cembre 2015. Tous les montants sont en dollars canadiens, sauf indication contraire.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Faits saillants corporatifs et financiers 2015&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2219 En recevant l\u2019autorisation du Conseil des ministres du gouvernement du Qu\u00e9bec, la Soci\u00e9t\u00e9 a compl\u00e9t\u00e9 le processus d\u2019\u00e9tude environnementale dont elle a besoin pour aller de l\u2019avant avec le d\u00e9veloppement du projet Lac \u00e0 Paul. Il s\u2019agit donc d\u2019une \u00e9tape importante dans le processus. La Soci\u00e9t\u00e9 poursuit les discussions avec de potentiels partenaires corporatifs, strat\u00e9giques et financiers.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tRespect de l\u2019\u00e9ch\u00e9ancier pr\u00e9vu pour les \u00e9tudes du projet des installations portuaires men\u00e9 par Port de Saguenay. Des \u00e9tudes environnementales sont en cours pour L\u2019Agence canadienne d\u2019\u00e9valuation environnementale (ACEE).&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tGr\u00e2ce au programme d\u2019optimisation des co\u00fbts op\u00e9rationnels, la Soci\u00e9t\u00e9 a annonc\u00e9 une \u00e9conomie substantielle par rapport aux pr\u00e9visions de d\u00e9part de l\u2019\u00c9tude de faisabilit\u00e9. Le co\u00fbt anticip\u00e9 est maintenant de 79 $US par tonne, calcul\u00e9 avec un taux de change de 0.95. Cette r\u00e9duction est due \u00e0 un plan minier optimis\u00e9 incluant des ressources additionnelles, ainsi que des \u00e9conomies associ\u00e9es \u00e0 un proc\u00e9d\u00e9 m\u00e9tallurgique simplifi\u00e9.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tIdentification de nouvelles ressources mesur\u00e9es et indiqu\u00e9es sur l'extension Est de la zone Paul lors d\u2019une nouvelle estimation NI 43-101 des ressources min\u00e9rales (M+I) pr\u00e9sentent sur la zone Paul. Ces r\u00e9sultats rapprochent la Soci\u00e9t\u00e9 de son objectif de d\u00e9montrer une capacit\u00e9 de 50 ans de dur\u00e9e de vie de la mine.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tSignature d\u2019une Entente de coop\u00e9ration avec les Premi\u00e8res Nations de Pessamit, Mashteuiatsh et Essipit pour la phase d\u2019exploration et de pr\u00e9construction de son projet. Cette entente positionne encore mieux la Soci\u00e9t\u00e9 dans la poursuite de son d\u00e9veloppement tout en tenant compte des int\u00e9r\u00eats de toutes les parties prenantes, incluant les communaut\u00e9s innues.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tReport d\u2019environ 600 000 $ en int\u00e9r\u00eat \u00e0 payer \u00e0 Mercury financement Corp. (le \u00ab pr\u00eateur \u00bb) jusqu\u2019\u00e0 \u00e9ch\u00e9ance \ndes lignes de cr\u00e9dit au 31 d\u00e9cembre 2015.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tObtention d\u2019une nouvelle facilit\u00e9 de cr\u00e9dit non renouvelable \u00e9largie de 18 750 000 $ de son pr\u00eateur actuel avec modification des termes, en octobre 2015. Cette nouvelle facilit\u00e9 \u00e9largie permettra \u00e0 la Soci\u00e9t\u00e9 de compl\u00e9ter sa facilit\u00e9 actuelle de 12 500 000 $ (plus int\u00e9r\u00eats courus).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Faits saillants subs\u00e9quents \u00e0 l'ann\u00e9e 2016&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Soci\u00e9t\u00e9 a annonc\u00e9 la nomination de Jean Lamarre en tant que pr\u00e9sident du Conseil d\u2019administration. Son exp\u00e9rience dans le domaine du d\u00e9veloppement du commerce international, de la finance et de la strat\u00e9gie d\u2019entreprise profitera de mani\u00e8re significative \u00e0 Arianne pour la progression du d\u00e9veloppement du Lac \u00e0 Paul&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Arianne a \u00e9galement annonc\u00e9 la nomination de Brian Ostroff \u00e0 titre de Chef de la direction. Son exp\u00e9rience dans la finance et la restructuration des entreprises aidera \u00e0 consolider les partenariats et le financement n\u00e9cessaires pour d\u00e9velopper le projet Lac \u00e0 Paul.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab L\u2019ann\u00e9e 2015 est une ann\u00e9e dont nous pouvons \u00eatre fiers \u00bb, mentionne Brian Ostroff, CEO d\u2019Arianne Phosphate. \u00ab La Soci\u00e9t\u00e9 a atteint ses principaux objectifs et cela a consid\u00e9rablement fait avancer ses chances de succ\u00e8s. Notre travail se tourne maintenant vers la s\u00e9curisation des partenaires et du financement afin de faire du projet du Lac \u00e0 Paul une r\u00e9alit\u00e9. \u00bb&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>R\u00e9sum\u00e9 financier&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En 2015, Arianne n\u2019a pas g\u00e9n\u00e9r\u00e9 de revenus ni de flux positifs de tr\u00e9sorerie puisque la Soci\u00e9t\u00e9 est toujours en phase de d\u00e9veloppement. Au cours de la p\u00e9riode de trois et douze mois termin\u00e9e le 31 d\u00e9cembre, la Soci\u00e9t\u00e9 a enregistr\u00e9 des pertes nettes respectivement de 1,0 M$ et de 3,9 M$, comparativement \u00e0 des pertes nettes de 1,4 M$ et de 5,6 M$ aux m\u00eames p\u00e9riodes en 2014. La perte nette et la consommation de tr\u00e9sorerie de la Soci\u00e9t\u00e9 sont similaires \u00e0 d\u2019autres soci\u00e9t\u00e9s mini\u00e8res en stade de d\u00e9veloppement.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La diminution de la perte nette et de la perte d\u2019exploitation est due au fait que la Soci\u00e9t\u00e9 a pris une s\u00e9rie de mesures afin de r\u00e9duire ses d\u00e9penses. Elle s\u2019est concentr\u00e9e principalement sur l\u2019obtention du permis et sur les diverses alternatives de financement, ce qui requiert moins de fonds de roulement.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Liquidit\u00e9&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c0 la fin de l\u2019ann\u00e9e 2015, la Soci\u00e9t\u00e9 avait une encaisse de 0,1 M$ et une ligne de cr\u00e9dit non utilis\u00e9e de 3,6 M$, lesquelles seront destin\u00e9es \u00e0 la r\u00e9alisation des importants travaux de d\u00e9veloppement du projet en 2016. Selon les estimations actuelles relatives au d\u00e9veloppement du projet, Arianne pr\u00e9voit qu\u2019elle aura besoin de financement additionnel avant la fin de l\u2019ann\u00e9e 2016.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Perspective&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En 2015, Arianne axera ses activit\u00e9s sur l\u2019avancement du projet Lac \u00e0 Paul. Voici ses principaux objectifs :&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tR\u00e9duire les d\u00e9penses op\u00e9rationnelles et les d\u00e9penses en capital;&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tPoursuivre les communications avec les parties prenantes et la communaut\u00e9;&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tAssister Port de Saguenay \u00e0 la s\u00e9curisation du permis environnemental par L\u2019ACEE;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022\tS\u00e9curiser le financement pour la construction et le d\u00e9veloppement du projet du Lac \u00e0 Paul.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les \u00e9tats financiers consolid\u00e9s audit\u00e9s et le rapport de gestion pour les p\u00e9riodes de trois et douze mois termin\u00e9es le 31 d\u00e9cembre 2015 sont disponibles sur le site web de la Soci\u00e9t\u00e9 et sur SEDAR (www.sedar.com).&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Personne qualifi\u00e9e&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c0 propos d'Arianne Phosphate\nArianne Phosphate (\u00ab Arianne Phosphate inc. \u00bb) (www.arianne-inc.com) mets en valeur les\ngisements de phosphate du projet Lac \u00e0 Paul, \u00e0 environ 200 km dans le nord de la r\u00e9gion du\nSaguenay-Lac-Saint-Jean au Qu\u00e9bec (Canada). Ces gisements produiront un concentr\u00e9 d'apatite\nign\u00e9e de grande qualit\u00e9 titrant 39 % P2O5 (\u00e9tude de faisabilit\u00e9 publi\u00e9e en 2013) et contenant peu ou\npas de contaminants. La Soci\u00e9t\u00e9 compte 105 803 943 actions en circulation<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About Arianne Phosphate&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Arianne Phosphate (\u00ab Arianne Phosphate inc. \u00bb) (www.arianneinc.com) met en valeur les gisements de phosphate du projet Lac \u00e0 Paul, \u00e0 environ 200 km au nord de la r\u00e9gion du Saguenay\u2013Lac-Saint-Jean au Qu\u00e9bec (Canada). Ces gisements produiront un concentr\u00e9 d\u2019apatite ign\u00e9e de grande qualit\u00e9 titrant 39 % P2O5 et contenant peu ou pas de contaminants. La Soci\u00e9t\u00e9 compte 97 225 755 actions en circulation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Ni la Bourse de croissance TSX ni son fournisseur de services de r\u00e9glementation (au sens donn\u00e9 \u00e0 ce terme dans les politiques de la Bourse de croissance TSX) n\u2019acceptent quelque responsabilit\u00e9 que ce soit quant au caract\u00e8re ad\u00e9quat ou \u00e0 l\u2019exactitude du pr\u00e9sent communiqu\u00e9 de presse.&nbsp;<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>&#8211; 30 &#8211;&nbsp;<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pour nous joindre&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Source: Jean-S\u00e9bastien David, chef des op\u00e9rations, T\u00e9l. : 418-549-7316, j.s.david@arianne-inc.com; <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Info: Joe Racanelli Tel. : 416-586-1943 jracanelli@national.ca <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Info: Brian Ostroff, chef de la direction, T\u00e9l. : 514-908-4202, brian.ostroff@arianne-inc.com; <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>M\u00e9dias: Karyna Tremblay, coordonnatrice relation aux communaut\u00e9s, T\u00e9l. : 418-549-7316, karyna.tremblay@arianne-inc.com<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u00a0<\/strong><strong>\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Suivez-nous sur :&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Facebook: https:\/\/www.facebook.com\/ariannephosphate&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Twitter: http:\/\/twitter.com\/arianne_dan&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">YouTube: http:\/\/www.youtube.com\/user\/ArianneResources&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flickr: http:\/\/www.flickr.com\/photos\/arianneresources&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Resource Investing News: http:\/\/resourceinvestingnews.com\/?s=Arianne&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde:<\/em><\/strong><em>L\u2019objectif d\u2019augmenter la dur\u00e9e de vie d\u2019exploitation du projet est de nature conceptuelle, car il n\u2019y a pas eu suffisamment de travaux d\u2019exploration pour d\u00e9finir des ressources min\u00e9rales mesur\u00e9es et indiqu\u00e9es de cette grandeur et qu\u2019il n\u2019est pas certain que des travaux additionnels d\u2019exploration pourront convertir les zones cibl\u00e9es en ressources min\u00e9rales mesur\u00e9es et indiqu\u00e9es. Cet objectif est bas\u00e9 sur les 472 Mt en r\u00e9serves et sur les autres ressources du projet (voir communiqu\u00e9 du 24 octobre 2013) ainsi que sur le nouveau potentiel cibl\u00e9 de ressources (voir communiqu\u00e9s du 15 mai, 12 juin et 14 octobre 2014).\u00a0 <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde :<\/em><\/strong><em>Les ressources min\u00e9rales pr\u00e9sent\u00e9es ici ne sont pas des r\u00e9serves min\u00e9rales, car elles n\u2019ont pas \u00e9t\u00e9 d\u00e9montr\u00e9es par une \u00e9tude de viabilit\u00e9 \u00e9conomique.\u00a0<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde concernant les informations prospectives&nbsp;<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Ce communiqu\u00e9 contient des \u00ab d\u00e9clarations prospectives \u00bb et des \u00ab renseignements prospectifs \u00bb au sens de la r\u00e9glementation des valeurs mobili\u00e8res applicable au Canada et aux \u00c9tats-Unis (ci-apr\u00e8s appel\u00e9s collectivement les \u00abrenseignements prospectifs \u00bb). Les renseignements prospectifs contenus dans le pr\u00e9sent communiqu\u00e9 sont fournis \u00e0 la date de celui-ci. Outre les exigences de la l\u00e9gislation pertinente sur les valeurs mobili\u00e8res, la Soci\u00e9t\u00e9 n\u2019a pas l\u2019intention de mettre \u00e0 jour ces renseignements prospectifs et elle n\u2019accepte aucune obligation \u00e0 cet \u00e9gard. Les renseignements prospectifs incluent, notamment, les d\u00e9clarations sur les estimations des ressources min\u00e9rales, l\u2019effet que les r\u00e9sultats des forages termin\u00e9s devraient avoir sur le projet, le calendrier des programmes de travaux \u00e0 venir et les attentes \u00e0 cet \u00e9gard. Il est souvent, mais pas toujours, possible de d\u00e9terminer les renseignements prospectifs par l\u2019usage de mots comme \u00ab planifie \u00bb, \u00ab s\u2019attend \u00bb, \u00ab devrait \u00bb, \u00ab budget \u00bb, \u00ab pr\u00e9vu \u00bb, \u00ab estimation \u00bb, \u00ab pr\u00e9vision \u00bb, \u00ab a l\u2019intention de \u00bb, \u00ab escompte \u00bb ou \u00ab croit \u00bb, ou leur n\u00e9gatif, ou des variantes de ces mots et expressions ou d\u00e9clarations selon lesquels des interventions, des \u00e9v\u00e9nements et des r\u00e9sultats \u00ab peuvent \u00bb, \u00ab pourraient \u00bb, \u00ab devraient \u00bb ou \u00ab seront \u00bb prises, se produiront ou pourront \u00eatre r\u00e9alis\u00e9s. Toute d\u00e9claration prospective porte uniquement sur la date \u00e0 laquelle elle est faite et sauf les exceptions qui peuvent \u00eatre impos\u00e9es par les lois applicables sur les valeurs mobili\u00e8res, la Soci\u00e9t\u00e9 rejette toute intention ou obligation de mettre \u00e0 jour toute d\u00e9claration prospective.<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>SAGUENAY, QUEBEC &#8211; (March 31, 2016) &#8211; Arianne Phosphate (the \u201cCompany\u201d or \u201cArianne\u201d) (TSX VENTURE: DAN; OTC: DRRSF; FRANKFURT: JE9N), a development-stage phosphate mining company, advancing the Lac \u00e0 Paul project in Quebec\u2019s Saguenay-Lac-Saint-Jean region, reported its financial results for both the three and twelve month periods ended December 31, 2015. All amounts are in [&hellip;]<\/p>","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-2892","post","type-post","status-publish","format-standard","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts\/2892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/comments?post=2892"}],"version-history":[{"count":0,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts\/2892\/revisions"}],"wp:attachment":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/media?parent=2892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/categories?post=2892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/tags?post=2892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}