{"id":2888,"date":"2015-10-26T19:12:00","date_gmt":"2015-10-26T19:12:00","guid":{"rendered":"https:\/\/www.arianne-inc.com\/?post_type=news&#038;p=2106"},"modified":"2022-03-30T21:14:45","modified_gmt":"2022-03-30T21:14:45","slug":"arianne-phosphate-welcomes-bape-report-on-lac-a-paul-mine","status":"publish","type":"post","link":"https:\/\/itremma.com\/arianne\/fr\/arianne-phosphate-welcomes-bape-report-on-lac-a-paul-mine\/","title":{"rendered":"ARIANNE PHOSPHATE ACCUEILLE DE FA\u00c7ON FAVORABLE\nLE RAPPORT DU BAPE SUR LE PROJET LAC \u00c0 PAUL"},"content":{"rendered":"<p class=\"wp-block-paragraph translation-block\">SAGUENAY, QUEBEC \u2013 (26 octobre 2015) - Arianne Phosphate Inc. (\u00ab Arianne \u00bb ou la \u00ab Soci\u00e9t\u00e9 \u00bb) (TSX CROISSANCE:DAN), (FRANCFORT:JE9N), (OTCBB:DRRSF), une soci\u00e9t\u00e9 en stade de d\u00e9veloppement du projet de mine de phosphate du Lac \u00e0 Paul, dans la r\u00e9gion du Saguenay\u2013Lac-Saint-Jean, au Qu\u00e9bec, publie aujourd\u2019hui son appr\u00e9ciation du rapport ind\u00e9pendant favorable du Bureau d\u2019audiences publiques sur l\u2019environnement (BAPE) portant sur son projet minier.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab Au nom d\u2019Arianne, de son \u00e9quipe de direction et de ses actionnaires, je tiens \u00e0 remercier Mme Parent et M. Locat, tous deux commissaires du BAPE, d\u2019avoir supervis\u00e9 le processus d\u2019audience publique et d\u2019avoir publi\u00e9 un rapport complet ind\u00e9pendant, et ce, de mani\u00e8re \u00e9quitable et transparente \u00bb, a d\u00e9clar\u00e9 Pierre Fitzgibbon, pr\u00e9sident du conseil d\u2019administration d\u2019Arianne Phosphate Inc. \u00ab Nous sommes particuli\u00e8rement heureux que le rapport n\u2019ait soulev\u00e9 aucune objection majeure au d\u00e9veloppement de notre projet, nous laissant donc croire qu\u2019il n\u2019y a aucune raison pour que le gouvernement du Qu\u00e9bec retarde son support au projet. Nous sommes \u00e9galement heureux de voir la commission mettre en \u00e9vidence un grand nombre de points positifs associ\u00e9s au projet Lac \u00e0 Paul.\u00bb\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le processus du BAPE constitue l\u2019avant derni\u00e8re \u00e9tape \u00e0 laquelle une entreprise doit se soumettre avant l\u2019obtention de l\u2019autorisation finale de son projet. Avec le d\u00e9p\u00f4t du rapport et l\u2019\u00e9valuation positive faite du projet Lac \u00e0 Paul, Arianne est convaincue d\u2019avoir r\u00e9pondu \u00e0 toutes les conditions requises \u00e0 l\u2019obtention d\u2019un d\u00e9cret final, et est confiante que le gouvernement du Qu\u00e9bec \u00e9mettra le d\u00e9cret en temps opportun.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab \u00c0 titre non seulement de chef des op\u00e9rations d\u2019Arianne, mais aussi en tant que membre de cette communaut\u00e9, je suis tr\u00e8s heureux des conclusions du rapport du BAPE \u00bb, a d\u00e9clar\u00e9 Jean-S\u00e9bastien David. Je suis d\u2019avis que les commissaires ont vu juste en concluant que ce projet a d\u00e9finitivement l\u2019appui de la r\u00e9gion, et que la r\u00e9alisation du projet Lac \u00e0 Paul contribuera au d\u00e9veloppement \u00e9conomique de notre r\u00e9gion. Le BAPE a consid\u00e9r\u00e9, dans son analyse, les retomb\u00e9es futures du projet et a mis en \u00e9vidence plusieurs des b\u00e9n\u00e9fices qui seront engendr\u00e9s par ce projet, et ce, pour plusieurs ann\u00e9es. Des \u00e9l\u00e9ments tels la cr\u00e9ation d\u2019emplois pour plusieurs g\u00e9n\u00e9rations, les opportunit\u00e9s pour les jeunes de notre r\u00e9gion et les retomb\u00e9es indirectes pour d\u2019autres entreprises comme le tourisme, ont tous \u00e9t\u00e9 cit\u00e9s par la commission comme \u00e9tant des b\u00e9n\u00e9fices significatifs pour la r\u00e9gion. \u00bb\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">M. David poursuit, \u00ab Compte tenu de l\u2019ampleur de notre projet, il \u00e9tait pr\u00e9visible que le BAPE soul\u00e8ve des questions concernant le processus entourant le d\u00e9veloppement des installations portuaires qui elles,\nrel\u00e8vent de la juridiction f\u00e9d\u00e9rale, et nous comprenons que le BAPE soit d\u2019avis que le processus \u00e0 suivre doit \u00eatre pr\u00e9cis et efficace. Nous croyons que les avis du rapport du BAPE sont acceptables et que leur r\u00e9alisation fera de Lac \u00e0 Paul un projet encore meilleur. Nous croyons que les conclusions positives paveront la voie pour qu\u2019Arianne re\u00e7oive du ministre qu\u00e9b\u00e9cois du D\u00e9veloppement durable, de l\u2019Environnement et de la Lutte contre les changements climatiques, le d\u00e9cret final approuvant la construction de la mine. Dans l\u2019attente du d\u00e9cret, nous poursuivons nos efforts d\u2019optimisation des co\u00fbts du projet, revoyons nos options de financement, et avan\u00e7ons nos discussions avec des partenaires strat\u00e9giques potentiels.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En pr\u00e9paration de la r\u00e9ception de son d\u00e9cret minist\u00e9riel, Arianne a vu le d\u00e9p\u00f4t d\u2019une vari\u00e9t\u00e9 d\u2019initiatives visant \u00e0 supporter le projet, le plus r\u00e9cent \u00e9tant le d\u00e9veloppement d\u2019un \u00e9coparc multi-usage initi\u00e9 par la MRC du Fjord-du-Saguenay. De plus, en r\u00e9ponse imm\u00e9diate aux r\u00e9sultats positifs du BAPE, plusieurs groupes ont d\u00e9j\u00e0 demand\u00e9 au gouvernement du Qu\u00e9bec d\u2019\u00e9mettre un d\u00e9cret imm\u00e9diatement.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En pr\u00e9paration de la r\u00e9ception de son d\u00e9cret minist\u00e9riel, Arianne a vu le d\u00e9p\u00f4t d\u2019une vari\u00e9t\u00e9 d\u2019initiatives visant \u00e0 supporter le projet, le plus r\u00e9cent \u00e9tant le d\u00e9veloppement d\u2019un \u00e9coparc multi-usage initi\u00e9 par la MRC du Fjord-du-Saguenay. De plus, en r\u00e9ponse imm\u00e9diate aux r\u00e9sultats positifs du BAPE, plusieurs groupes ont d\u00e9j\u00e0 demand\u00e9 au gouvernement du Qu\u00e9bec d\u2019\u00e9mettre un d\u00e9cret imm\u00e9diatement.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Selon une \u00e9tude de la firme de comptables Raymond Chabot Grant Thornton, la r\u00e9alisation du projet Lac \u00e0 Paul d\u2019Arianne devrait g\u00e9n\u00e9rer un investissement de 1,2 milliard $, cr\u00e9ant dans la r\u00e9gion du Saguenay\u2013Lac-Saint-Jean plus de 2 200 emplois directs et indirects durant la p\u00e9riode de construction, et approximativement 1 000 emplois durant les 25 ans d\u2019op\u00e9ration de la mine. L\u2019\u00e9tude r\u00e9v\u00e8le \u00e9galement que le projet Lac \u00e0 Paul cr\u00e9era une nouvelle industrie dans la province tout en g\u00e9n\u00e9rant environ 1 milliard $ en revenu d\u2019emploi et plus de 12,6 milliards $ en revenus pour la province de Qu\u00e9bec.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c0 propos d'Arianne Phosphate\nArianne Phosphate (\u00ab Arianne Phosphate inc. \u00bb) (www.arianne-inc.com) mets en valeur les\ngisements de phosphate du projet Lac \u00e0 Paul, \u00e0 environ 200 km dans le nord de la r\u00e9gion du\nSaguenay-Lac-Saint-Jean au Qu\u00e9bec (Canada). Ces gisements produiront un concentr\u00e9 d'apatite\nign\u00e9e de grande qualit\u00e9 titrant 39 % P2O5 (\u00e9tude de faisabilit\u00e9 publi\u00e9e en 2013) et contenant peu ou\npas de contaminants. La Soci\u00e9t\u00e9 compte 105 803 943 actions en circulation&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u00c0 propos du BAPE&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le Bureau d\u2019audiences publiques sur l\u2019environnement est un organisme public et neutre qui rel\u00e8ve du ministre du D\u00e9veloppement durable, de l\u2019Environnement et de la Lutte contre les changements climatiques. Il a pour mission d\u2019\u00e9clairer la d\u00e9cision gouvernementale dans une perspective de d\u00e9veloppement durable, lequel englobe les aspects \u00e9cologique, social et \u00e9conomique. Pour r\u00e9aliser cette mission fondamentale, le BAPE informe, enqu\u00eate et consulte la population sur des projets ou des questions relatives \u00e0 la qualit\u00e9 de l\u2019environnement que lui soumet le ministre. Il produit par la suite des rapports d\u2019enqu\u00eate qui sont rendus publics. Le BAPE est par cons\u00e9quence un organisme gouvernemental consultatif et non d\u00e9cisionnel.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About Arianne Phosphate&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Arianne Phosphate (\u00ab Arianne Phosphate inc. \u00bb) (www.arianne\u2010inc.com) met en valeur les gisements de\nphosphate du projet Lac \u00e0 Paul, \u00e0 environ 200 km au nord de la r\u00e9gion du Saguenay\u2013Lac\u2010Saint\u2010Jean au\nQu\u00e9bec (Canada). Ces gisements produiront un concentr\u00e9 d\u2019apatite ign\u00e9e de grande qualit\u00e9 titrant\n39 % P2O5 et contenant peu ou pas de contaminants. La Soci\u00e9t\u00e9 compte 95 325 755 actions en\ncirculation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><sup>(1) <\/sup>(1) Mise en garde : Les estimations des co\u00fbts d'exploitation ont \u00e9t\u00e9 d\u00e9velopp\u00e9es par Arianne en utilisant des ressources internes et externes\nqualifi\u00e9es et sont d\u00e9pendantes de l'accord du gouvernement, des autorit\u00e9s et des fournisseurs, lequel n\u2019est pas final. Ils ne sont donc pas\nconformes au R\u00e8glement 43\u2010101 pour le moment.\u00a0<\/p>\n\n\n\n<p class=\"has-text-align-center has-small-font-size wp-block-paragraph\"><em>Ni la Bourse de croissance TSX ni son fournisseur de services de r\u00e9glementation (au sens donn\u00e9 \u00e0 ce terme dans les politiques de la Bourse de croissance TSX) n\u2019acceptent quelque responsabilit\u00e9 que ce soit quant au caract\u00e8re ad\u00e9quat ou \u00e0 l\u2019exactitude du pr\u00e9sent communiqu\u00e9 de presse.&nbsp;<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pour nous joindre&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Source: Jean-S\u00e9bastien David, C.O.O. Tel.: 418-549-7316 <a href=\"mailto:j.s.david@arianne-inc.com\">j.s.david@arianne-inc.com<\/a> <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Info: Brian Ostroff Tel.: 514-908-4202 <a href=\"mailto:bostroff@windermerecapital.com\">bostroff@windermerecapital.com<\/a> <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Joe Racanelli Tel.: 416-586-1943 <a href=\"mailto:jracanelli@national.ca\">jracanelli@national.ca<\/a>\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Medias : Karyna Tremblay, Community\u00a0Relations Coordinator Tel.: 418-549-7316 <a href=\"mailto:karyna.tremblay@arianne-inc.com\">karyna.tremblay@arianne-inc.com<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Suivez-nous sur :&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Facebook: <a href=\"https:\/\/www.facebook.com\/ariannephosphate\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.facebook.com\/ariannephosphate<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Twitter: <a href=\"http:\/\/twitter.com\/arianne_dan\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/twitter.com\/arianne_dan<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">YouTube: <a href=\"http:\/\/www.youtube.com\/user\/ArianneResources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.youtube.com\/user\/ArianneResources<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flickr: <a href=\"http:\/\/www.flickr.com\/photos\/arianneresources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.flickr.com\/photos\/arianneresources<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ressources Investing News: <a href=\"http:\/\/resourceinvestingnews.com\/?s=Arianne\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/resourceinvestingnews.com\/?s=Arianne<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>D\u00e9clarations et renseignements prospectifs&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde concernant les informations prospectives&nbsp;<\/em><\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph translation-block\"><em>This news release contains \u201cforward-looking statements\u201d and \u201cforward-looking information\u201d within the <\/em>meaning of applicable securities regulations in Canada and the United States (collectively, \u201cforward looking information\u201d). Forward-looking information includes, but is not limited to, anticipated quality and production of the apatite concentrate at the Lac \u00e0 Paul project. Often, but not always, forward looking information can be identified by the use of words such as \u201cplans\u201d, \u201cexpects, \u201cis expected\u201d,&nbsp; \u201cbudget\u201d, \u201cscheduled\u201d, \u201cestimates\u201d, forecasts\u201d, \u201cintends\u201d, \u201canticipates\u201d, or \u201cbelieves\u201d, or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results&nbsp; \u201cmay\u201d, \u201ccould\u201d, \u201cwould\u201d, \u201cmight\u201d, or \u201cwill\u201d be taken, occur or be achieved. Forward-looking information&nbsp; is subject to known and unknown risks, uncertainties and other factors that may cause the actual results,&nbsp; level of activity, performance or achievements of the Company to be materially different from those&nbsp; expressed or implied by such forward-looking information, including but not limited to: volatile stock&nbsp; price; risks related to changes in commodity prices; sources and cost of power facilities; the estimation of&nbsp; initial and sustaining capital requirements; the estimation of labour and operating costs; the general&nbsp; global markets and economic conditions; the risk associated with exploration, development and&nbsp; operations of mineral deposits; the estimation of mineral reserves and resources; the risks associated&nbsp; with uninsurable risks arising during the course of exploration, development and production; risks&nbsp; associated with currency fluctuations; environmental risks; competition faced in securing experienced&nbsp; personnel; access to adequate infrastructure to support mining, processing, development and&nbsp; exploration activities; the risks associated with changes in the mining regulatory regime governing the&nbsp; Company; completion of the environmental assessment process; risks related to regulatory and&nbsp; permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,&nbsp; capitalization and liquidity risks including the risk that the financing necessary to fund continued&nbsp; exploration and development activities at Lac \u00e0 Paul project may not be available on satisfactory terms,&nbsp; or at all; the risk of potential dilution through the issue of common shares; the risk of litigation. Forward looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in commodity prices, exploration and development plans proceeding in accordance with plans and such plans achieving their stated expected outcomes, receipt of required regulatory approvals, and <em>such other assumptions and factors as set out herein. Although the Company has attempted to identify <\/em>important factors that could cause actual results to differ materially from those contained in the&nbsp;forward-looking information, there may be other factors that cause results not to be as anticipated,&nbsp; estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made as of the date of this press release, and the Company does not undertake to update such forward-looking information except in accordance with applicable <em>securities laws.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>SAGUENAY, QUEBEC &#8211; (October 26, 2015) &#8211; Arianne Phosphate (the \u201cCompany\u201d or \u201cArianne\u201d), a\u00a0 development-stage phosphate mining company, today issued the following statement commenting on the favorable independent report released by the Bureau d\u2019audiences publiques sur l\u2019environnement\u00a0 (BAPE) on the company\u2019s Lac \u00e0 Paul project in Quebec\u2019s Saguenay-Lac-Saint-Jean region.\u00a0 \u201cOn behalf of Arianne, its management [&hellip;]<\/p>","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-2888","post","type-post","status-publish","format-standard","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts\/2888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/comments?post=2888"}],"version-history":[{"count":0,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts\/2888\/revisions"}],"wp:attachment":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/media?parent=2888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/categories?post=2888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/tags?post=2888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}