{"id":2857,"date":"2014-05-15T00:31:00","date_gmt":"2014-05-15T00:31:00","guid":{"rendered":"https:\/\/www.arianne-inc.com\/?post_type=news&#038;p=2066"},"modified":"2022-04-03T02:50:03","modified_gmt":"2022-04-03T02:50:03","slug":"arianne-receives-nicole-zone-mineral-resource-estimates-1-of-78-million-tonnes-at-5-34-p2o5-inferred","status":"publish","type":"post","link":"https:\/\/itremma.com\/arianne\/fr\/arianne-receives-nicole-zone-mineral-resource-estimates-1-of-78-million-tonnes-at-5-34-p2o5-inferred\/","title":{"rendered":"ARIANNE RECEIVES NICOLE ZONE MINERAL RESOURCE ESTIMATES <sup>(1)<\/sup>&nbsp;OF 78 MILLION TONNES AT 5.34% P<sub>2<\/sub>O<sub>5 <\/sub>INFERRED"},"content":{"rendered":"<p class=\"has-text-align-center has-small-font-size wp-block-paragraph translation-block\">POTENTIEL(1) CIBL\u00c9 ADDITIONNEL DE 260 \u00c0 390 MILLIONS DE TONNES \u00c0 UNE TENEUR ENTRE 5,34 ET 7,13%\nP2O5 PR\u00c8S DE LA SURFACE ET \u00c0 MOINS DE 1 KM DE LA ZONE PAUL<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">SAGUENAY, QU\u00c9BEC - (15 mai, 2014) \u2013 Arianne Phosphate (la \u00ab Soci\u00e9t\u00e9 \u00bb ou \u00ab Arianne \u00bb) (Bourse de croissance\nTSX : DAN) (FRANCFORT : JE9N) (OTCBB : DRRSF), une soci\u00e9t\u00e9 au stade du d\u00e9veloppement du projet de mine de\nphosphate du Lac \u00e0 Paul, dans la r\u00e9gion du Saguenay, au Qu\u00e9bec, annonce qu\u2019elle ajoute 78 millions de tonnes \u00e0\n5,34% P2O5 de ressources pr\u00e9sum\u00e9es (teneur de coupure \u00e0 3,5% P2O5) \u00e0 ses ressources min\u00e9rales. En plus, Arianne a\nidentifi\u00e9 un nouveau potentiel cibl\u00e9 de 260 \u00e0 390 millions de tonnes \u00e0 une teneur se situant entre 5,34% et 7,13%\nP2O5. La quantit\u00e9 et la teneur du potentiel cibl\u00e9 sont de nature conceptuelle puisqu\u2019il n\u2019y a pas eu suffisamment de\ntravaux d\u2019exploration pour d\u00e9finir une ressource min\u00e9rale. Il n\u2019est cependant pas certain que des travaux\nd\u2019exploration additionnels pourront d\u00e9limiter une ressource min\u00e9rale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As per Feasibility Study at the Lac \u00e0 Paul Project (released October 24, 2013), the Paul deposit alone currently has proven and probable reserves of 472 million tonnes of ore at 6.90% P2O5 and is projected to have a mine life of roughly&nbsp; 26 years. The indication of an additional 78 million tonnes of inferred resources at Nicole along with the potential target of between 260 and 390 million tonnes could be of significant benefit to Arianne\u2019s operations and deserves additional investigative work.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are very excited about the additional inferred mineral resources in Nicole and the new potential target which has been identified. We are also anxious to understand how beneficial the overall impact of these finds may be to our&nbsp; Company given that these zones lie between our Paul and Manouane deposits,\u201d stated Brian Kenny, Chief Executive&nbsp; Officer of Arianne. \u201cWhat we already know is that these additional inferred near-surface mineral resources in Nicole could further reduce the already low stripping ratio of our mining operation and thus improve the economics of the project as a whole. Nicole is ideally located right beside Paul and could allow seamless integration into our current mining plan put forth in our bankable feasibility study. Additional drilling will be required to upgrade these resources&nbsp; and incorporate them into the project mining plan.\u201d&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Brian Kenny added, \u201cAs Arianne has started to understand the size and scope of its Paul and Manouane deposits, it has discussed the district scale potential of their holdings. If these early indications of Nicole and the additional potential&nbsp; zones are proven out, it could certainly go a long way towards substantiating our beliefs.\u201d&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Description des ressources min\u00e9rales additionnelles&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">La Zone Nicole est situ\u00e9e juste au SUD-EST de la zone principale Paul. L'estimation des ressources min\u00e9rales a \u00e9t\u00e9\neffectu\u00e9e en utilisant les donn\u00e9es de forages, le lev\u00e9 topographique de surface \u201cLIDAR 3D\u201d ainsi que la d\u00e9riv\u00e9e\npremi\u00e8re verticale du lev\u00e9 g\u00e9ophysique h\u00e9liport\u00e9 \u00e0 haute sensibilit\u00e9 magn\u00e9tique (HeliMAGerTM) r\u00e9alis\u00e9 en f\u00e9vrier\n2014 par G\u00e9ophysique GPR International Inc.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00a0<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><img decoding=\"async\" src=\"https:\/\/lh3.googleusercontent.com\/msz0jH-Zgtz_8tXukNPEyaW4leDtJ2YUGJXmmzzD2eoMT7YxvuPXBB7pfOGV8ggfyr5uVngFAJyqr3Zouyet7E4loMOb8gxVRhRLSnduao_lJ8uYMzD0mrCMIdM1kFhb-TmuHLEa\" style=\"width: 1024px;\">                  Vue des deux corps mod\u00e9lis\u00e9s de la Zone Nicole en utilisant les donn\u00e9es de forages et les donn\u00e9es du lev\u00e9\na\u00e9romagn\u00e9tique.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Estimation des ressources min\u00e9rales pr\u00e9sum\u00e9es de la Zone Nicole (chiffres arrondis).&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table alignwide is-style-regular\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>P<\/strong><strong><sub>2<\/sub><\/strong><strong>O<\/strong><strong><sub>5 <\/sub><\/strong>%&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>TiO<\/strong><strong><sub>2 <\/sub><\/strong>%&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Tonnes<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Corps_I&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">5.31&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">6.26&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">76,000,000<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Corps_II&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">6.23&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">6.36&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">2,200,000<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Total&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">5.34&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">6.26&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">78,200,000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Les ressources min\u00e9rales pr\u00e9sum\u00e9es sont a u-dessus de 3,5% P2O5. No tez que ces ressources min\u00e9rales ne sont pas\ndes r\u00e9serves min\u00e9rales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Donn\u00e9es utilis\u00e9es pour cette estimation:&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>vingt (20) forages carott\u00e9s r\u00e9alis\u00e9s sur la zone Nicole (NIC-11-01 \u00e0 Nic-11-20);\u00a0<\/li><li>la longueur totale des forages de la zone Nicole est de 4005 m\u00e8tres;\u00a0\u00a0 <\/li><li>1305 assay results for %P<sub>2<\/sub>O<sub>5<\/sub>, %TiO<sub>2<\/sub>, %SiO<sub>2<\/sub>, %Fe<sub>2<\/sub>O<sub>3<\/sub>, %AL<sub>2<\/sub>O<sub>3<\/sub>, %CaO, %K<sub>2<\/sub>O, %Na<sub>2<\/sub>O, %MnO &amp; %MgO;\u00a0<\/li><li>241 donn\u00e9es de d\u00e9viation;\u00a0\u00a0<\/li><li>629 descriptions lithologiques.<\/li><\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Parameters of the estimation are:&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>477 composites de 3 m\u00e8tres ont \u00e9t\u00e9 cr\u00e9\u00e9s;\u00a0<\/li><li>densit\u00e9 moyenne de 3,42;\u00a0\u00a0<\/li><li>la taille de chaque bloc mod\u00e8le est de 10 m (EW) x 10 m (NS) x 10 m (Z);\u00a0\u00a0\u00a0<\/li><li>deux enveloppes min\u00e9ralis\u00e9es 3D ont \u00e9t\u00e9 mod\u00e9lis\u00e9es.<\/li><\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Deux mod\u00e8les de blocs avec les m\u00eames param\u00e8tres ont \u00e9t\u00e9 cr\u00e9\u00e9s en utilisant un ellipso\u00efde de recherche de\ndimension 350 x 150 x 75m dont le grand axe est orient\u00e9 dans une direction subverticale avec un pendage de 70\u00b0\nvers le NE.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les r\u00e9sultats des forages diamant\u00e9s combin\u00e9s avec le dernier lev\u00e9 a\u00e9romagn\u00e9tique de 2014 a permis \u00e0 GoldMinds\nGeoservices Inc., consultant ind\u00e9pendant, d\u2019estimer les premi\u00e8res ressources min\u00e9rales de la Zone Nicole. La figure\nsuivante pr\u00e9sente la corr\u00e9lation et la co\u00efncidence des r\u00e9sultats.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le programme d'AQ\/CQ inclut les blancs et les standards. Il d\u00e9montre que les r\u00e9sultats d\u2019analyse sont pr\u00e8s des\nvaleurs attendues et contribue \u00e0 la divulgation des premi\u00e8res ressources min\u00e9rales de la Zone Nicole.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><img decoding=\"async\" style=\"width: 1024px;\" src=\"https:\/\/lh6.googleusercontent.com\/wv2_yA3ihzspl-1ZyvMwsOd8WPbyOlQCMhWKTANn0QXVGGRav1PsSzLeACVHETyaLyirtQbaBLutseqZ2sEDCg9tTeY5AT8dDa2lMNRQh6kAKYFh-DjjOiv4VwJzjnncqsduMwhz\">                           Corr\u00e9lation positive entre les contours digitalis\u00e9s de l'anomalie magn\u00e9tique (premi\u00e8re d\u00e9riv\u00e9e verticale) et les\nintervalles min\u00e9ralis\u00e9s de la Zone Paul.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>D\u00e9termination du nouveau potentiel cibl\u00e9 identifi\u00e9&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L'analyse en profondeur du lev\u00e9 a\u00e9romagn\u00e9tique (d\u00e9riv\u00e9e premi\u00e8re verticale) combin\u00e9e avec les forages r\u00e9alis\u00e9s\ndans la Zone Paul montre que le contour des anomalies magn\u00e9tiques co\u00efncide avec les limites des enveloppes\nmin\u00e9ralis\u00e9es d\u00e9finies ant\u00e9rieurement lors de l\u2019estimation des ressources min\u00e9rales de la Zone Paul. Dans la Zone\nNicole, l\u2019extension des deux corps min\u00e9ralis\u00e9s a \u00e9t\u00e9 d\u00e9limit\u00e9e en utilisant le contour de l\u2019anomalie magn\u00e9tique et les\nr\u00e9sultats de forage.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De plus, en utilisant les informations existantes des forages et les contours de la d\u00e9riv\u00e9e premi\u00e8re verticale du lev\u00e9\nmagn\u00e9tique, un nouveau potentiel de ressources min\u00e9rales a \u00e9t\u00e9 identifi\u00e9 par GoldMinds Geoservices Inc., un\nconsultant ind\u00e9pendant pour la Soci\u00e9t\u00e9.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En fait, trois zones situ\u00e9es \u00e0 proximit\u00e9 de la Zone Paul ont \u00e9t\u00e9 identifi\u00e9es comme potentiel cibl\u00e9 et m\u00e9ritent des\ntravaux suppl\u00e9mentaires. Ce sont les extensions OUEST et SUD-EST de la Zone Paul ainsi qu\u2019une autre zone situ\u00e9e juste\nau NORD-EST de la Zone Paul et nomm\u00e9e \u201cNouvelle\u201d.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Le potentiel min\u00e9ral de ces zones, en assumant une profondeur de 200 \u00e0 300 m\u00e8tres avec une teneur variant de 5,34\n\u00e0 7,13% P2O5, est de 260 \u00e0 390 millions de tonnes. Il est important de mentionner que dans la Zone Paul, les r\u00e9serves\nmin\u00e9rales s'\u00e9tendent jusqu\u2019\u00e0 400 m\u00e8tres de profondeur. La quantit\u00e9 et la teneur du potentiel cibl\u00e9 sont de nature\nconceptuelle puisqu\u2019il n\u2019y a pas eu suffisamment de travaux d\u2019exploration pour d\u00e9finir une ressource min\u00e9rale. Il\nn\u2019est cependant pas certain que des travaux d\u2019exploration additionnels pourront d\u00e9limiter une ressource min\u00e9rale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dans les semaines \u00e0 venir, Arianne continuera la compilation des donn\u00e9es d\u00e9j\u00e0 re\u00e7ues afin \u00e0 mieux comprendre\nl\u2019ampleur de ces r\u00e9sultats.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>(1) Mise en garde:&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les ressources min\u00e9rales pr\u00e9sent\u00e9es ici ne sont pas des r\u00e9serves min\u00e9rales, car elles n\u2019ont pas \u00e9t\u00e9 d\u00e9montr\u00e9es par\nune \u00e9tude de viabilit\u00e9 \u00e9conomique. Le potentiel de tonnage et teneur pr\u00e9sent\u00e9 comme potentiel min\u00e9ral est de\nnature conceptuelle, car il n\u2019y a pas eu suffisamment de travaux d\u2019exploration pour d\u00e9finir des ressources min\u00e9rales\net qu\u2019il n\u2019est pas certain que des travaux additionnels d\u2019exploration pourront convertir ce potentiel en ressources\nmin\u00e9rales.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/lh5.googleusercontent.com\/RWDv0mHYRFbNC31Um5qEYWD16OgWa4O1Am_zT1cbeD5YnoV2CDwb-8_LgSXt8AO5SWHN6F19sJEEG8It2k1U4VH2ULhYfpEwpRI-ec3gpqojXt7DwJhtyI8GBqBC6u_hbJPJ-j-n\" alt=\"\" width=\"798\" height=\"365\"\/><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\" style=\"font-size:16px\">Localisation du potentiel cibl\u00e9 et des zones.\nLes contours en pointill\u00e9s noirs repr\u00e9sentent les secteurs de ressources min\u00e9rales existants.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Notez que les r\u00e9sultats de forage des Zones TraMan et Paul extension Ouest sont en cours de compilation et qu\u2019ils\nseront publi\u00e9s une fois tous re\u00e7us, compil\u00e9s et interpr\u00e9t\u00e9s&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img decoding=\"async\" src=\"https:\/\/www.arianne-inc.com\/wp-content\/uploads\/2022\/03\/Screen-Shot-2022-03-16-at-5.58.11-PM-1024x416.png\" alt=\"\" class=\"wp-image-2068\"\/><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\" style=\"font-size:16px\"><strong><\/strong>Lev\u00e9 g\u00e9ophysique magn\u00e9tique h\u00e9liport\u00e9 (d\u00e9riv\u00e9e premi\u00e8re verticale) montrant les anomalies magn\u00e9tiques\ng\u00e9n\u00e9ralement orient\u00e9es ESE-ONO et E-O.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Projet du Lac \u00e0 Paul&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le projet du Lac \u00e0 Paul est un des plus grands nouveaux projets de mine de phosphate au monde qui inclut plusieurs\nzones min\u00e9ralis\u00e9es contenant des ressources. Comme mentionn\u00e9 dans l\u2019\u00c9tude de Faisabilit\u00e9 du projet du Lac \u00e0 Paul\n(publi\u00e9e le 24 octobre 2013), le projet poss\u00e8de une VAN de 1,98$, un TRI de 20,7% et un retour sur l\u2019investissement\nen capital de 4,4 ans.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ressources min\u00e9rales&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le rapport technique NI 43-101 de l\u2019\u00e9tude de faisabilit\u00e9 d\u00e9pos\u00e9 le 18 novembre 2013 est disponible sous le profil de\nla Soci\u00e9t\u00e9 sur SEDAR \u00e0 www.sedar.com. <a href=\"http:\/\/www.sedar.com\" data-type=\"URL\" data-id=\"www.sedar.com\" target=\"_blank\" rel=\"noreferrer noopener\">www.sedar.com<\/a>.&nbsp;<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph translation-block\">R\u00c9SERVES ET RESSOURCES MIN\u00c9RALES ACTUELLES DU PROJET DU LAC \u00c0 PAUL<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.arianne-inc.com\/wp-content\/uploads\/2022\/03\/Screen-Shot-2022-03-16-at-6.05.00-PM.png\" alt=\"\" class=\"wp-image-2072\" width=\"661\" height=\"216\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">En plus des ressources min\u00e9rales pr\u00e9sentes dans la zone Paul, des ressources min\u00e9rales conformes au R\u00e8glement 43-\n101 ont d\u00e9j\u00e0 \u00e9t\u00e9 estim\u00e9es sur les Zones 2 et Manouane de la propri\u00e9t\u00e9 du Lac \u00e0 Paul. Ces ressources, publi\u00e9es en\nnovembre 2011 dans le rapport technique 43-101 de SGS Geostat (disponible sous le profil de la soci\u00e9t\u00e9 sur SEDAR \u00e0\nwww.sedar.com), n'ont pas \u00e9t\u00e9 mises \u00e0 jour, puisqu'aucun forage suppl\u00e9mentaire n'a \u00e9t\u00e9 r\u00e9alis\u00e9 sur ces zones depuis\n2011. Elles sont pr\u00e9sent\u00e9es dans le tableau suivant :&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img decoding=\"async\" src=\"https:\/\/www.arianne-inc.com\/wp-content\/uploads\/2022\/03\/Screen-Shot-2022-03-16-at-6.04.00-PM-1024x259.png\" alt=\"\" class=\"wp-image-2073\"\/><\/figure><\/div>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>R\u00e9serves min\u00e9rales<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Les r\u00e9serves min\u00e9rales prouv\u00e9es et probables dans la Zone Paul sont de 472,09 Mt \u00e0 une teneur moyenne de\n6,88 % P2O5 avec un seuil de coupure de 3,5 % P2O5. Ceci tient compte d'un facteur de dilution de 2 % lors de\nl'exploitation mini\u00e8re et d'un taux de r\u00e9cup\u00e9ration du minerai de 97 %. Le coefficient de recouvrement est de 0,87 au\ncours des 4 premi\u00e8res ann\u00e9es et de 1,14 par la suite, sur la dur\u00e9e de vie de la mine. Au total, 75,7 millions de tonnes\nde concentr\u00e9 vendable \u00e0 une teneur de 38,6 % P2O5 ont \u00e9t\u00e9 d\u00e9finies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<strong>Mineral Reserve Estimate&nbsp;<\/strong><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.arianne-inc.com\/wp-content\/uploads\/2022\/03\/Screen-Shot-2022-03-16-at-6.10.52-PM.png\" alt=\"\" class=\"wp-image-2074\" width=\"704\" height=\"230\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">M. Claude Duplessis, ing. GoldMinds G\u00e9oservices Inc. et personne qualifi\u00e9e ind\u00e9pendante selon les normes NI 43-\n101, a pr\u00e9par\u00e9 les ressources min\u00e9rales et l\u2019\u00e9valuation du potentiel. Il est responsable de l\u2019information technique\npr\u00e9sente dans ce communiqu\u00e9 de presse.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">M. Daniel Boulianne, g\u00e9o., V.P. Exploration Arianne et personne qualifi\u00e9e selon les normes NI 43-101, a approuv\u00e9 ce\ncommuniqu\u00e9 de presse.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About Arianne Phosphate&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Ni la Bourse de croissance TSX ni son fournisseur de services de r\u00e9glementation (au sens donn\u00e9 \u00e0 ce terme dans les politiques de\nla Bourse de croissance TSX) n\u2019acceptent quelque responsabilit\u00e9 que ce soit quant au caract\u00e8re ad\u00e9quat ou \u00e0 l\u2019exactitude du\npr\u00e9sent communiqu\u00e9 de presse.<\/p>\n\n\n\n<p class=\"has-text-align-center has-small-font-size wp-block-paragraph\"><em>Ni la Bourse de croissance TSX ni son fournisseur de services de r\u00e9glementation (au sens donn\u00e9 \u00e0 ce terme dans les politiques de la Bourse de croissance TSX) n\u2019acceptent quelque responsabilit\u00e9 que ce soit quant au caract\u00e8re ad\u00e9quat ou \u00e0 l\u2019exactitude du pr\u00e9sent communiqu\u00e9 de presse.&nbsp;<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pour nous joindre&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Source<\/strong>Brian Kenny, Chef de la direction  Tel: 514-699-7436 <a href=\"mailto:brian.kenny@arianne-inc.com\">brian.kenny@arianne-inc.com<\/a> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Info: <\/strong>Derek Lindsay, chef des finances T\u00e9l. : (514) 594-2372 <a href=\"mailto:derek@arianne-inc.com\">derek@arianne-inc.com<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Suivez-nous sur :<\/strong>:&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Facebook<\/strong>: <a href=\"http:\/\/www.facebook.com\/pages\/Arianne-Resources-Inc\/113071105425184\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.facebook.com\/pages\/Arianne-Resources-Inc\/113071105425184<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Twitter: <\/strong><a href=\"http:\/\/twitter.com\/arianne_dan\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/twitter.com\/arianne_dan<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>YouTube: <\/strong><a href=\"http:\/\/www.youtube.com\/user\/ArianneResources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.youtube.com\/user\/ArianneResources<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Flickr: <\/strong><a href=\"http:\/\/www.flickr.com\/photos\/arianneresources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.flickr.com\/photos\/arianneresources<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ressources Investing News: <\/strong><a href=\"http:\/\/resourceinvestingnews.com\/?s=Arianne\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/resourceinvestingnews.com\/?s=Arianne<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>D\u00e9clarations et renseignements prospectifs&nbsp;<\/em><\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph translation-block\">Ce communiqu\u00e9 contient des \u00ab d\u00e9clarations prospectives \u00bb et des \u00ab renseignements prospectifs \u00bb au sens de la\nr\u00e9glementation des valeurs mobili\u00e8res applicable au Canada et aux \u00c9tats-Unis (ci-apr\u00e8s appel\u00e9s collectivement les\n\u00abrenseignements prospectifs \u00bb). Les renseignements prospectifs contenus dans le pr\u00e9sent communiqu\u00e9 sont fournis \u00e0\nla date de celui-ci. Outre les exigences de la l\u00e9gislation pertinente sur les valeurs mobili\u00e8res, la Soci\u00e9t\u00e9 n\u2019a pas\nl\u2019intention de mettre \u00e0 jour ces renseignements prospectifs et elle n\u2019accepte aucune obligation \u00e0 cet \u00e9gard. Les\nrenseignements prospectifs incluent, notamment, les d\u00e9clarations sur les estimations des ressources min\u00e9rales, l\u2019effet\nque les r\u00e9sultats des forages termin\u00e9s devraient avoir sur le projet, le calendrier des programmes de travaux \u00e0 venir\net les attentes \u00e0 cet \u00e9gard. Il est souvent, mais pas toujours, possible de d\u00e9terminer les renseignements prospectifs\npar l\u2019usage de mots comme \u00ab planifie \u00bb, \u00ab s\u2019attend \u00bb, \u00ab devrait \u00bb, \u00ab budget \u00bb, \u00ab pr\u00e9vu \u00bb, \u00ab estimation \u00bb, \u00ab pr\u00e9vision \u00bb,\n\u00ab a l\u2019intention de \u00bb, \u00ab escompte \u00bb ou \u00ab croit \u00bb, ou leur n\u00e9gatif, ou des variantes de ces mots et expressions ou\nd\u00e9clarations selon lesquels des interventions, des \u00e9v\u00e9nements et des r\u00e9sultats \u00ab peuvent \u00bb, \u00ab pourraient \u00bb, \u00ab devraient\n\u00bb ou \u00ab seront \u00bb prises, se produiront ou pourront \u00eatre r\u00e9alis\u00e9s. Toute d\u00e9claration prospective porte uniquement sur la\ndate \u00e0 laquelle elle est faite et sauf les exceptions qui peuvent \u00eatre impos\u00e9es par les lois applicables sur les valeurs\nmobili\u00e8res, la Soci\u00e9t\u00e9 rejette toute intention ou obligation de mettre \u00e0 jour toute d\u00e9claration prospective.<\/p>","protected":false},"excerpt":{"rendered":"<p>&#8211; Additional potential target (1) of between 260 to 390 million tonnes with a P2O5 grade range of&nbsp; 5.34 to 7.13% P205 &#8211; near-surface within 1km from Paul zone &#8211;&nbsp; SAGUENAY, QUEBEC &#8211; (May 15, 2014) &#8211; Arianne Phosphate (the \u201cCompany\u201d or \u201cArianne\u201d) (TSX VENTURE: DAN)&nbsp; (FRANKFURT: JE9N) (OTCBB: DRRSF), a development-stage phosphate company advancing [&hellip;]<\/p>","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[],"tags":[],"class_list":["post-2857","post","type-post","status-publish","format-standard","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts\/2857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/comments?post=2857"}],"version-history":[{"count":0,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/posts\/2857\/revisions"}],"wp:attachment":[{"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/media?parent=2857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/categories?post=2857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/itremma.com\/arianne\/fr\/wp-json\/wp\/v2\/tags?post=2857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}